Jared started sanding the deck last Sunday and Monday. Then it rained the rest of the week so we couldn't work on it. We resumed our work on Saturday and spent the entire day with the two of us sanding the deck. I thought for sure with both of us working we would get the deck stained on Saturday, but it took the entire day just to finish the sanding.
Today is Sunday and we were going to spend the entire day staining the deck. Again I thought with a full 8-10 hours of two people working on it, it would get done. We only bought a gallon of stain, thinking that would be plenty for our deck. My parents stain our cabin with only about 2.5 gallons so surely that would be enough. So when 5pm rolled around not only were we physically running low, we were also running low on stain. We used the entire gallon and got some of the railing and all of the floor done. I think we'll need at least 1, if not 2 more gallons to stain the underside and the rest of the railings and stairs.
Jared was also excited because he got to cut a portion of the deck off. One of the floorboards was sticking up a little because of a support that was too high. He borrowed Dave's reciprocating saw, cut a little of the post (about a 1/2 inch), and voila the board is now flush.
The weather is supposed to be nice the rest of the week so hopefully we'll finish before Friday when Jared's family arrives.
This was before when we started sanding:
And here is what we finished today:
It looks finished but the stairs, underside, and outside of the railings (only accessible from a ladder) still need to be stained. . .oye! :)